The home before the start of the remodel.

056

Starting the process by laying strings and forming for the concrete walk way finished with slate.

059

We reinforced the posts stirrups with rebar so the posts could be raised reducing chance of rot occurring at soil level.

067

Pour Day!

068

Posts up.

132

The 6×6 post married to the existing wall hopefully tied it in seamlessly.

135

Finding out that the existing walls were not reinforced was an unexpected surprise so we added rebar before dry packing the brick cells.

IMG_4883

Starting to take shape.

IMG_4882

Lights were installed in the posts, to add to the ambiance.

IMG_4883

Allowing TM Builders to design this trellis allowed the homeowner to have more control over the process and saved him cost of the drawings by an architect.

Next Outdoor Spaces Item →Outdoor Space